Calle Langosta

Funded the Inter-American Development Bank, through the collaboration of the municipality of Santa Cruz, ADIT managed the paving of 2.5 km of street from Downtown Tamarindo to Langosta Beach.
This project covered a total length of 2.5 km and included various road infrastructure works on both sides of the road, from the curb to the pipe.
Calle Langosta Sidewalks
