Calle Langosta

Funded the Inter-American Development Bank, through the collaboration of the municipality of Santa Cruz, ADIT managed the paving of 2.5 km of street from Downtown Tamarindo to Langosta Beach.

This project covered a total length of 2.5 km and included various road infrastructure works on both sides of the road, from the curb to the pipe.

Tamarindo Seguro

Increase Police Presence and create awareness in and Around Tamarindo to Deter Crime